Airport perimeters
Full airside perimeter runs — new build, tie-ins and section replacements. Coordinated with airport ops so the security envelope stays intact.
Airside-grade chain link, barbed wire toppings and cantilever access gates — installed to Transport Canada AFR guidance and airport operator spec across BC.
Airport perimeters have zero tolerance for gaps. We build 8–12 ft galvanized chain link with 3-strand barb or razor tape, schedule-40 posts on concrete footings, and cantilever slide gates for controlled vehicle access — phased so the operational perimeter is never open.

Full airside perimeter runs — new build, tie-ins and section replacements. Coordinated with airport ops so the security envelope stays intact.
Regional airfields, flight training bases and private strips. Perimeter fence, controlled vehicle gates and pedestrian access.
Fuel farms, hangar compounds and MRO yards inside the airport boundary — secondary security fencing with locked access.
Buried skirt, small-mesh bottoms and grade sealing to control deer, coyote and small-mammal incursions near runway and taxiway edges.
Yes. We install 8–12 ft galvanized chain link with 3-strand barbed wire or razor tape, schedule-40 posts, and concrete-set terminals — configured to meet Transport Canada AFR guidance and airport operator specs.
We stage builds in phased runs, coordinate with airside ops, and use temporary security fence panels so the operational perimeter is never open. Escorted access and background-checked crews on request.
We add buried skirt, small-mesh bottom panels, and grade sealing to control deer, coyote and small-mammal incursions along runway and taxiway perimeters.
Galvanized runs, barb-wire toppings and cantilever access gates from projects that translate directly to airport and airfield spec. Tap any tile for the full photo.